NY is spending $7B to on a Phase 2, to expand a long delayed subway line by 1.5 miles, and half the tunnel is pre-existing from abandoned project in 1970s.

The original Phase 1 was only about 1.5 miles and took something around 20 years on top of the existing half built stuff from the 1970s

There is a Phase 3 to expand the line a further 4 miles with all new tunnels, and there is a rarely talked about Phase 4 to go a final 2 miles again in all new tunnel.

I point to this project in terms of an example of those with a negative agenda "knock stuff down" without having a matching, if not pre-requisite "build better stuff" plan in place. The original 2nd Ave line was planned in the 1920s, they knocked down elevated train lines in the 1940s in anticipation, but didn't start the subway project til 1970s, which opened for service in 2017. By the time Phase 4 finishes in 2140 or so, we may have finally matched the transit removed in 1940s.

So any modern era "just knock down __" without first building transit / alternates / etc risks putting us in a net transportation deficit for a lifetime or three.