On the flipside, I think that this is still such an ongoing debate is part of why the pipeline operator is still stuck in Stage 2 and having trouble getting into Stage 3, despite being listed as a "priority" multiple times on and before 2020. TC-39 isn't blindly following anyone here, they seem to be dragging their heels hoping that someone comes along with an even better compromise between the styles.